
Projects
Cable view




Project: Development of a motorized trolley for long ziplines with automatic self-ascent
Scope: Project management from A to Z: Creation of a proof of concept, Industrial design, mechanical and electronic design, Manufacturing and industrialization, tests, certification and industrial property.
Duration: 16 months
Associated engineering: Mechanical design (aluminum machining, plastic parts, bearing system). Electronic design (control and power).



Autonomous Mechatronic Zipline




Project: Development of a motorized trolley for long ziplines with automatic self-ascent
Scope: Project management from A to Z: Creation of a proof of concept, Industrial design, mechanical and electronic design, Manufacturing and industrialization, tests, certification and industrial property.
Duration: 16 months
Associated engineering: Mechanical design (aluminum machining, plastic parts, bearing system). Electronic design (control and power).


Visuals by @mag-design
Zip line with turns




Project: Development of a zip line trolley and its curved rails system.
Scope: Project from A to Z: Project management, specifications, design, conception, industrialization, certification and industrial property.
Duration: 12 months
Associated Engineering: Welded frame, bearings system, connection between the rails. Electronic design for added functions.
Standards: EN 15567:2015 + EN 17109:2019





On parles de nous sur le petit écran...





Cable fall arrester
Project: Development of a cable fall arrester for industrial applications.
Scope: Project from A to Z: Project management, specifications, design, conception, industrialization, certification and industrial property.
Duration: 12 months
Manufacturing processes: Laser cutting, stamping, machining, aluminum forging, industrial riveting, springs, surface treatments.
Standards: EN 353.1:2014 + A1:2017
New PPE regulation 2016-425
Industrial property: Patent ES1220317U





Shock absorber
Project: Development of a shock absorber (energy absorber) for anchor devices.
Scope: Project from A to Z: Project management, specifications, design, conception, industrialization, certification and industrial property.
Duration: 9 months
Manufacturing processes: Laser cutting, plastic injection, surface treatments.
Standards: EN 353.1:2014 + A1:2017
EN 795.C:2016
New PPE regulation 2016-425
Industrial property: European patent EP3550176A1

Lifeline pulley




Project: Re-design of a rolling trolley for safety cable (lifeline) with the objective of reducing manufacturing costs and increasing mechanical resistance.
Scope: Mechanical and functional design.
Duration: 3 months
Manufacturing processes: Stainless Steel Foundry (Micro Fusion)
Standards: EN 795.C:2016
Realization: 83% increase in mechanical strength and 31% reduction in manufacturing cost.






Assembly of photovoltaic panels
Project: Development of an invisible mounting system for photovoltaic panels ("Flat" aesthetics) for residential application.
Scope: Project management and mechanical design.
Duration: 18 months
Manufacturing processes: Aluminum extrusion, plastic injection, machining, stamping.
Standards: UL 2703
Industrial property:
US patent: US9416992
US patent: US9531319
Assembly of photovoltaic panels




Project: Development of a mounting system for BIPV photovoltaic panels ensuring the waterproofing of the roof, for industrial applications.
Scope: Project management, specifications, mechanical design, industrialization and certification
Duration: 12 months
Manufacturing processes: Aluminum extrusion, machining.
Standards: Pass Inov' (CSTB)
Industrial property:
European patent: EP2489958A1
